{"id":8967,"date":"2024-06-22T08:13:11","date_gmt":"2024-06-22T02:43:11","guid":{"rendered":"https:\/\/studybizz.com\/schemes\/?p=8967"},"modified":"2024-06-22T08:13:11","modified_gmt":"2024-06-22T02:43:11","slug":"amaravati-railway-line-work-begins-these-are-the-new-railway-stations","status":"publish","type":"post","link":"https:\/\/studybizz.com\/schemes\/amaravati-railway-line-work-begins-these-are-the-new-railway-stations\/","title":{"rendered":"Amaravati Railway Line Work Begins, These are the new railway stations"},"content":{"rendered":"\n<p>The work on the Amaravati Railway Line project mobilized within just 10 days of the formation of the Telugu Desam Party led NDA government in the state.<\/p>\n\n\n\n<p>Amaravati railway line project was actually sanction in 2017-18. It consists of three routes on which the Amravati railway line project has to be constructed. <\/p>\n\n\n\n<p><strong>Three railway lines under this project are as belo<\/strong>w:<\/p>\n\n\n\n<p>Errupalem-Amaravati-Namburu railway line 56.53 km (double line)<\/p>\n\n\n\n<p>Amravati-Pedakurapadu railway line 24.5 km<\/p>\n\n\n\n<p>Narasaraopet sattenapalli railway line 25 km<\/p>\n\n\n\n<p>However this project was neglected by the previous government which didn&#8217;t show much interest in this project and thus even the land acquisition process didn&#8217;t complete. <\/p>\n\n\n\n<p>The newly formed government has assured the people of Andhra Pradesh on fast tracking the construction of the new capital city of Andhra Pradesh. It is surprising to see railway department has received gazette notification for the land acquisition for this project within just 10 days the new government formed in the state.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_80 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/studybizz.com\/schemes\/amaravati-railway-line-work-begins-these-are-the-new-railway-stations\/#First_phase_land_acquisition_begins_for_5653_km\" >First phase land acquisition begins for 56.53 km<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/studybizz.com\/schemes\/amaravati-railway-line-work-begins-these-are-the-new-railway-stations\/#These_are_the_9_new_railway_stations_to_be_constructed\" >These are the 9 new railway stations to be constructed<\/a><\/li><\/ul><\/nav><\/div>\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"First_phase_land_acquisition_begins_for_5653_km\"><\/span>First phase land acquisition begins for 56.53 km<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Out of the three route maps under the Amravati railway project, the major one is Errupalem-Amaravati-Namburu line covering the distance of 56.53 km. <\/p>\n\n\n\n<p>It has to be a double line project but the railway department has issued gazette notification for a single line as of now.<\/p>\n\n\n\n<p>A total of 450 hectare land acquisition to be completed for the first 56.53 km line.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-src=\"https:\/\/studybizz.com\/schemes\/wp-content\/uploads\/2024\/06\/7_828ca8690a2122681119613257044-1024x576.jpg\" alt=\"\" class=\"wp-image-8982 lazyload\" data-srcset=\"https:\/\/studybizz.com\/schemes\/wp-content\/uploads\/2024\/06\/7_828ca8690a2122681119613257044-1024x576.jpg 1024w, https:\/\/studybizz.com\/schemes\/wp-content\/uploads\/2024\/06\/7_828ca8690a2122681119613257044-300x169.jpg 300w, https:\/\/studybizz.com\/schemes\/wp-content\/uploads\/2024\/06\/7_828ca8690a2122681119613257044-768x432.jpg 768w, https:\/\/studybizz.com\/schemes\/wp-content\/uploads\/2024\/06\/7_828ca8690a2122681119613257044.jpg 1280w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/576;\" \/><figcaption class=\"wp-element-caption\">Amaravati Railway line Route Map<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"These_are_the_9_new_railway_stations_to_be_constructed\"><\/span>These are the 9 new railway stations to be constructed <span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>These are the new railway stations to be built in the first phase as part of Amaravati railway project.<\/p>\n\n\n\n<p>Details of Railway Stations on Errupalem &#8211; Amaravati &#8211; Nambur Railway route are as below:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Peddapuram<\/li>\n\n\n\n<li>Chinnaravuru Palem<\/li>\n\n\n\n<li>Gottimukkala<\/li>\n\n\n\n<li>Paritala<\/li>\n\n\n\n<li>KothaPeta<\/li>\n\n\n\n<li>WaddaManu<\/li>\n\n\n\n<li>Amaravati &#8211; Major Railway Station for the Capital City of Andhra Pradesh <\/li>\n\n\n\n<li>Tadikonda<\/li>\n\n\n\n<li>Koppuravuru<\/li>\n<\/ol>\n\n\n\n<p>This line initially begins at Errupalem which is on Hyderabad-Vijayawada railway line and joins at Nambur which is on Guntur-Vijayawada railway line. Mainly Amaravati railway station will remain to be the big station in this route. Most of the goods trains will stop at Paritala.<\/p>\n\n\n\n<p>This railway project requires land acquisition in Khammam district of Telangana along with erstwhile Guntur and Krishna districts. It is estimated that 2600 crores will be spent on the construction of the first single line.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The work on the Amaravati Railway Line project mobilized within just 10 days of the formation of the Telugu Desam Party led NDA [&hellip;]<\/p>\n<div class='heateor_sss_sharing_container heateor_sss_vertical_sharing' style='width:44px;right: -10px;top: 100px;-webkit-box-shadow:none;box-shadow:none;' data-heateor-sss-href='https:\/\/studybizz.com\/schemes\/amaravati-railway-line-work-begins-these-are-the-new-railway-stations\/'><div class=\"heateor_sss_sharing_ul\"><a aria-label=\"Whatsapp\" class=\"heateor_sss_whatsapp\" href=\"https:\/\/api.whatsapp.com\/send?text=STUDYBIZZ%20-%20GOVERNMENT%20SCHEMES%20UPDATES%20https%3A%2F%2Fstudybizz.com%2Fschemes%2Famaravati-railway-line-work-begins-these-are-the-new-railway-stations%2F\" title=\"Whatsapp\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg\" style=\"background-color:#55eb4c;width:40px;height:40px;margin:0;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><span class=\"heateor_sss_square_count heateor_sss_whatsapp_count\">&nbsp;<\/span><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"-6 -5 40 40\"><path class=\"heateor_sss_svg_stroke heateor_sss_no_fill\" stroke=\"#fff\" stroke-width=\"2\" fill=\"none\" d=\"M 11.579798566743314 24.396926207859085 A 10 10 0 1 0 6.808479557110079 20.73576436351046\"><\/path><path d=\"M 7 19 l -1 6 l 6 -1\" class=\"heateor_sss_no_fill heateor_sss_svg_stroke\" stroke=\"#fff\" stroke-width=\"2\" fill=\"none\"><\/path><path d=\"M 10 10 q -1 8 8 11 c 5 -1 0 -6 -1 -3 q -4 -3 -5 -5 c 4 -2 -1 -5 -1 -4\" fill=\"#fff\"><\/path><\/svg><\/span><\/a><a aria-label=\"Telegram\" class=\"heateor_sss_button_telegram\" href=\"https:\/\/telegram.me\/share\/url?url=https%3A%2F%2Fstudybizz.com%2Fschemes%2Famaravati-railway-line-work-begins-these-are-the-new-railway-stations%2F&text=STUDYBIZZ%20-%20GOVERNMENT%20SCHEMES%20UPDATES\" title=\"Telegram\" rel=\"nofollow noopener\" target=\"_blank\" style=\"font-size:32px!important;box-shadow:none;display:inline-block;vertical-align:middle\"><span class=\"heateor_sss_svg heateor_sss_s__default heateor_sss_s_telegram\" style=\"background-color:#3da5f1;width:40px;height:40px;margin:0;display:inline-block;opacity:1;float:left;font-size:32px;box-shadow:none;display:inline-block;font-size:16px;padding:0 4px;vertical-align:middle;background-repeat:repeat;overflow:hidden;padding:0;cursor:pointer;box-sizing:content-box\"><span class=\"heateor_sss_square_count heateor_sss_Telegram_count\">&nbsp;<\/span><svg style=\"display:block;\" focusable=\"false\" aria-hidden=\"true\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"100%\" height=\"100%\" viewBox=\"0 0 32 32\"><path fill=\"#fff\" d=\"M25.515 6.896L6.027 14.41c-1.33.534-1.322 1.276-.243 1.606l5 1.56 1.72 5.66c.226.625.115.873.77.873.506 0 .73-.235 1.012-.51l2.43-2.363 5.056 3.734c.93.514 1.602.25 1.834-.863l3.32-15.638c.338-1.363-.52-1.98-1.41-1.577z\"><\/path><\/svg><\/span><\/a><\/div><div class=\"heateorSssClear\"><\/div><\/div>","protected":false},"author":1,"featured_media":8983,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-8967","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schemes"],"_links":{"self":[{"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/posts\/8967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/comments?post=8967"}],"version-history":[{"count":2,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/posts\/8967\/revisions"}],"predecessor-version":[{"id":8984,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/posts\/8967\/revisions\/8984"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/media\/8983"}],"wp:attachment":[{"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/media?parent=8967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/categories?post=8967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/studybizz.com\/schemes\/wp-json\/wp\/v2\/tags?post=8967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}